TAMPINES ST 62 PAREL A EC

REGISTER INTEREST

Tampines St 62 Parcel A EC

Call Hotline For More Information

6100 8108

DISTRICT

D18 – Tampines

UNITS

Est 590

DEVELOPER

Qingjian and Santarli

TENURE

99 years

Register Your Interest for Tampines St 62 Parcel A EC!

The land plot slated for the next EC development in Tampines, at St 62 Parcel A, was sold on 3 Aug 2021. 

It is part of the next phase of development in Tampines North, alongside many new BTO projects.

Located very near to the future Tampines North Cross Island Line, this project is expected to be in high demand! 

✅  Part of up and coming Tampines North development area
✅  Very near to MRT
✅  Land Sold in Aug 2021
✅  Est Public Sales Launch: Q4 2022

Register Interest!

Contact Form - New Launch
Press Coverage

23 July 2021 Record bids lodged for Tampines EC plot, Lentor Central residential site , Straits Times
“The $422 million bid is the highest land rate to be paid for an EC site in the history of this type of housing.

It broke the previous record land rate of $603 psf ppr for an EC site in Tengah Garden Walk, the last GLS EC land tender that closed just before this tender.”

Update 22 July 2021
Executive Condominium Housing Development at Tampines Street 62 (Parcel A)

Land Area (sqm): 23,799.2

Maximum Gross Floor Area (sqm): 59,498

Tender Launch Date: 15 April 2021

Tender Close Date: 22 July 2021

Note: A decision on the award of the tender will be made after the bids have been evaluated. This will be announced at a later date.

S/NName of TendererTender Price ($)
1QJ-OS Pte. Ltd. and Santarli Realty Pte. Ltd.  $422,000,000.00
2Intrepid Investments Pte. Ltd. and TID Residential Pte. Ltd. $416,283,400.00
3Hoi Hup Realty Pte Ltd and Sunway Developments Pte. Ltd. $415,280,000.00
4Tarak Properties SG Pte. Ltd. $406,988,000.00
5MCC Land (Singapore) Pte Ltd  $401,080,000.00
 6 CSC Land Group (Singapore) Pte. Ltd. $387,464,065.56
7GLL C Pte. Ltd. $385,000,000.00
 8Sim Lian Land Pte Ltd  $366,666,000.00
 9EL Development Pte Ltd  $356,100,000.00

Particulars of Site at Tampines St 62

Location: Tampines Street 62 (Parcel A)
Proposed Development: Executive Condominium
Land Area: 23,799.2 sqm
Maximum Gross Floor Area: 59,498 sqm
Lease Term: 99 years

Tampines St 62 Parcel A EC Street View

About Tampines St 62 (Parcel A) (EC)

Tampines Street 62 Parcel A is a plot of land released under the GLS (Government Land Sales) Programme, slated for the development of an Executive Condominium.

Submission of Tender
On 22 July 2021, Thursday, from 9:00am to 12:00pm at The Procurement Office. Any tender submitted after 12:00pm on the tender submission date will not be considered.

Provisional Tender Results
The Provisional Tender Results will be available on 22 July 2021, Thursday, after 5:00pm via the HDB Land Sales page and at the Procurement Office.

Technical Information

ELECTRIC VEHICLES (EV) CHARGING INFRASTRUCTURE PROVISION

LTA requires the Successful Tenderer to comply with the following requirements:

i) To future-proof new development sites in Singapore, the Successful Tenderer is required to have active and passive provision of EV charging points for the development.

ii) Active provision refers to charging points that are fully wired and ready for use by EVs. Passive provision refers to catering of sufficient electrical power at the consumer switch room(s) and/or substation(s) to allow more chargers to be installed and activated easily when demand increases in future. As a start, the Successful Tenderer is to ensure at least 15% of the total car-park lots can minimally support 3-Phase AC Type 2 chargers with power output of 7kW per charging point (i.e. passive provision), of which at least 1% must be installed with EV charging points (i.e. active provision). The detailed requirements are set out in Clause 3.0 of the Conditions and Requirements of Relevant Competent Authorities and Public Utility Licensees.

iii) For active provision, the Successful Tenderer shall indicate the location, number and type of chargers to be installed for LTA’s approval at the plan submission stage. At the CSC stage, LTA will verify that the minimum active provision as approved have been made and are ready for use by EVs. For passive provision, the Successful Tenderer shall submit a declaration (with supporting documents) to LTA at the plan submission stage on the following using the submission template in Appendix D (I):

a. Total number of lots with active and passive provision, and total number of lots.
b. Total electrical load required for lots with active and passive provision.
c. Electrical load required from the rest of the development.
d. Approved total electrical load from SPPG.

PropertyX